Phase One of the Park will establish the site infrastructure and a 2-story, approximately 41,000 gross square foot facility. The scope of work includes approximately a
120-seat auditorium off the main entry/lobby, collaboration lobby located on the second floor, conference rooms, researcher/staff offices, restrooms, support spaces, and mechanical/electrical service areas. The project will finish-out and provide Furniture, Fixtures & Equipment (FF&E) for
all common spaces and for Activator Labs 1 & 2. Programmatic review by the new Vice President of
Research will be integrated into the project's design process.
The building's design is based upon a "Lab Lease" concept. Therefore, the labs provide for full flexibility within multi-type lab utilization. Also, the lab finish-out and equipment cost will be a part of the lease terms based upon the researcher and/or laboratory needs. The project site will be developed in accordance with the Campus Master Plan Architectural and Site Design Guidelines, and include, parking, service area, landscape enhancements and public art. |