The project includes the interior renovation and build-out of approximately 30,000 square feet of new Athletic administrative office space on levels 2 and 3 at the East Side of Jones AT&T Stadium, 2526 Mac Davis Ln, Lubbock, TX 79407.
3/29/2020
* Scope of Work:
Base Bid: All 2nd floor finish out + 3rd floor lobby without Restrooms
Alternate 2 - 3rd Floor South Side Finish Out:
~5,750 SF add containing build out of the Media Suite to the south of the base build central core. Media Suite to include admin station, open collab space, equipment room, nine (9) standard offices, one large office, conference room, and sixteen (16) workstations, along with necessary support spaces - janitor closet and two restrooms (one for each sex) to be north of the base bid central core, all others south - $9,403,407. |