The existing plant will receive new chilled water & heating water equipment, variable speed centrifugal chiller with chilled water pumps, gas-fired boilers, heating water pumps, and condenser fluid pumps, upgrade electrical equipment, and replace the existing evaporative cooling towers with more efficient water & energy cooling towers.
Piping will be configured to obtain more flexibility & redundancy between the chillers, chilled water pumps & condensing fluid pumps.
The Building Automation System will be upgraded.
The necessity for a new supplemental utility plant is being analyzed based on supply and demand models to resolve flow issues on the expanding west end of campus. |